  JSC “OGK-6” is carrying out investment activity along the following lines:                   implementation of large-scale investment projects;                   updating the existing industrial facilities.    

Large-Scale Investment Projects  

Project

Increase of capacity (MW)

Imprementation date

“Addition of a gas turbine to steam turbine plant, GRES-24, Unit No. 1” (CCGT Unit-420)

110

2Q 2010

“Modernization of the condensing section of Kirishskaya GRES on the basis of combined cycle technology”, unit No. 6 (CCGT Unit-800)

500

4Q 2011

“Construction of Novocherkasskaya GRES Power Unit No. 9 using circulating fluidized bed technology”, Unit No. 9 (330 MW)

330

4Q 2014

“Construction of Cherepovetskaya GRES Power Unit No. 4 on the basis of combined cycle technology”, unit No. 4 (CCGT Unit-420)

420

4Q2014

“Reconstruction of Ryazanskaya GRES Power Unit No.2 (270 MW) with the disposal of the main equipment”

60

4Q 2014

“Reconstruction of Novocherkasskaya GRES Power Unit No. 7 (300 MW)”

36

4Q2012

Total for the investment program

1,496

 

Technical Reequipping and Modernization of the Existing Industrial Facilities

According to the JSC “OGK-6” investment program plan for 2009 the Company was expected to use capital investments for medium- and small-scale projects in the amount of 1,839,207.1 thousand rubles (excluding VAT). In 2009, acceptance reports were signed for 1,986,205.4 thousand rubles or 108%.

Implementation of the Program for Technical Reequipping and Modernization of the Existing Industrial Facilities of JSC “OGK-6” in 2008-2009, thousand rubles

Name of JSC “OGK-6” branch

2008

2009

implemented, excluding VAT

implemented, excluding VAT

Financed, including VAT

JSC “OGK-6” total including:

2,892,381.2

1,986,205.4

1,950,313.2

Ryazanskaya GRES (without unit No. 7)

661,765.4

235,894.2

282,995.1

GRES-24 (Ryazanskaya GRES unit No. 7)

32,300.9

404,653.8

161,625.4

Krasnoyarskaya GRES-2

215,195.6

169,822.1

177,099.9

Kirishskaya GRES

911,739.4

663,351.2

665,560.8

Novocherkasskaya GRES

862,207.0

364,286.0

485,259.1

Cherepovetskaya GRES

153,170.1

78,609.0

95,058.9

Branch in Moscow

56,002.7

69,589.1

82,714.0

 

All the main works planned for 2009 on technical reequipment and main equipment reconstruction have been completed. The overall implementation level at JSCOGK-6” was 108%. Activities held enabled the generating equipment to be replaced by more modern and cost-efficient equipment, increased the performance reliability and quality of electricity supplied as well as provide for competitiveness of the Company on a liberalized electricity market liberalization.

Modernization of the Existing Industrial Facilities According to the JSC “OGK-6” investment program plan for 2008 the company was expected to use capital investments for medium- and small-scale projects in the amount of 2,903,126.2 thousand rubles (excluding VAT). Acceptance reports were signed for 2,892,381.2 thousand rubles or 99.6%.   Among the most important investment program projects are reconstruction of TFRM-500 current transformers, reconstruction of smokestack No. 2 at Ryazanskaya GRES, reconstruction of OSG – 110 kV electric facilities with installation of an automatic transformer and reconstruction of the water treatment plant (Chemical Treatment Plant-2) at Kirishskaya GRES, reconstruction of power unit No. 7 at Novocherkasskaya GRES and reconstruction of the fuel feed tunnel at Cherepovetskaya GRES.

 

Share price


Quotes are delayed according to exchanges regulations.
Powered by RUSTOCKS.com



Dialogue

Çàäàéòå âîïðîñ
ATS ÎÀÎ ÑÎ ÖÄÓ ÅÝÑ © 2007 JSC «OGK-6» All rights reserved  Ogilvy
© ÎÀÎ "ÎÃÊ-6"
Âñå ïðàâà çàùèùåíû